Case Studies

Bagmoor Wind Farm

Bagmoor Wind FarmCMS specified Combigrid to reinforce site access roads during the installation of eight new turbines at Bagmoor Wind Farm in Normanby, near Scunthorpe. CMS designed the integrated geogrid and geotextile system to deliver high performance and cost-effective ground reinforcement for contractors, McNicholas Construction.

CS-Bagmoor-wind-farm.pdf

Three Towers Apartment Regeneration

3 towersCMS specified and supplied Envirotrak to create a permanent gravelled car parking area for the Urban Splash 3 Towers regeneration project in Manchester.

CS-3-Towers-Regeneration.pdf

Lancaster Waste Park

SecugridCMS had to ensure rapid delivery of its specialist geogrids to keep ground reinforcement at a Bovis Lend Lease waste recycling development on schedule. The waste recycling development is built on a 50-acre ‘brownfield’ site in Lancaster, formerly used for Leyland truck testing. To prepare the ground for construction, Kiernan Construction had to first level the area, which involved excavating in-situ concrete and reinforcing the ground with the BBA and CE certified geogrid where necessary. CS-Lancaster-waste-park.pdf

Tesco Regional Distribution Centre

groundworks at new Tesco site CMS specified and supplied its Slope-Guard Type 5 and Bentofix NSP 4900, erosion and clay lining materials, for two rainwater collection lagoons serving a new £65 million Tesco regional distribution centre (RDC) near Goole. As the 850,000 square foot Tesco RDC was built in an ecologically protected area, water evacuation from its roof had to be managed using environmentally friendly methods. CS-Tesco-Bentofix.pdf

Scout Moor Wind Farm

Scout MoorCMS conducted a value engineering exercise on behalf of McNicholas Construction, replacing the geogrid originally specified for Scout Moor Wind Farm with the more cost effective CMS SecuGrid range. This was used to provide stable foundations for 26 turbines and 12km of roads. Scout Moor Case Study.pdf

Hareshill Business Park

Harehill Situated on farmland in Greater Manchester, the new build development of Hareshill Business Park required a solution that would ensure commercial buildings were concealed from view of neighbouring residents so that local planning could be secured. The solution was a 9m high bund for which CMS Secugrid provided an efficient earth retention system. Hareshill Case Study.pdf

Yarrow Road

Yarrow RoadCMS Secugrid was selected to provide extensive soil reinforcement during a 52,500m2 ‘cut and fill’ project, at the Yarrow Road site, Dorset, in order for the construction of commercial and retail buildings to begin. Yarrow Road case study.pdf